BATTERY INTERCONNECT AND SENSING ASSEMBLIES: A DFM CHECKLIST Ampnera | https://www.ampnera.com/en/ | Sales@ampnera.com Project / company: Contact: Application: Drawing / model revision: Sample quantity / pilot quantity / estimated production demand: Target date: Fill in what is known and mark open questions. This brief supports an engineering discussion; the sample configuration, test conditions, and acceptance limits need separate agreement. WHAT IS INCLUDED IN THE BATTERY ASSEMBLY? Notes / decisions: Open items / owner / due date: BEGIN WITH THE CELL LAYOUT AND JOINING INTERFACES [ ] Identify the datums used to locate cells, current collectors, and sensing parts. [ ] Show terminal materials, finishes, joining zones, and prohibited areas. [ ] Check access for positioning, clamping, joining, inspection, and any agreed rework. [ ] Define which sample joints represent the intended production process and how joint acceptance will be assessed. Open items / owner / due date: DEFINE SENSING CONNECTIONS BY NODE AND PIN Voltage sensing: Node names, polarity, connector pins, joining points, and the required continuity and isolation checks. Your input: Temperature sensing: Sensor type, location, attachment, routing, and the customer's check method and acceptance limits. Your input: Mechanical integration: Retention, bend space, handling, assembly sequence, and access to inspect the connections. Your input: Monitoring interface: The mating BMS connection and agreed division of responsibility for harnesses, connectors, hardware, and software. Your input: Open items / owner / due date: CHECK INSULATION AND THE ASSEMBLY SEQUENCE Notes / decisions: Open items / owner / due date: AGREE SAMPLE ACCEPTANCE AND PRODUCTION HANDOVER [ ] Dimensional and assembly checks against the agreed datums and mating interfaces. [ ] Connection and joint checks using the specified method and limits. [ ] Continuity, pin assignment, sensing, and insulation checks required for the assembly. [ ] Any agreed environmental or mechanical checks, plus a separate plan for complete module or pack qualification. Open items / owner / due date: Reference guide: https://www.ampnera.com/en/resources/battery-interconnect-sensing-dfm/ Discuss an NDA before sending confidential project files.